Et profilbilde

Professor II
Olav Gerhard Haukenes Nygaard { "honorific-suffix": "Professor II", "fn": "Olav Gerhard Haukenes Nygaard", "tel": "", "email": "gerhard.nygaard@uis.no" }

Avdeling/enhet Det teknisk- naturvitenskapelige fakultet
Institutt/senter Institutt for petroleumsteknologi
Rom KE E-331

Forskningsområder

Utvalgte publikasjoner

Pågående forskning

Arbeidserfaring

Vitenskapelige publikasjoner (fra CRISTin)

  • Zhou, Jing; Nygaard, Olav Gerhard Haukenes (2011). Decentralized Adaptive Sabilization for Large-Scale Systems with Unknown Time-Delay. INTECH. ISBN 978-953-307-559-4. 16 s.
  • Nygaard, Olav Gerhard Hauken (2006). Multivariable process control in high temperature and high pressure environment using non-intrusive multi sensor data fusion. Norwegian University og Science and Technology, Faculty of Technology : Telemark University College. ISBN 8247178206.
  • Randeberg, Erlend; Ford, Eric Patrick; Nygaard, Olav Gerhard Haukenes; Eriksson, Magnus; Gressgård, Leif Jarle; Hansen, Kåre (2012). Potentials for cost Reduction for Geothermal Well Construction in view of Various Drilling Technologies and Automation Opportunities. Stanford University; 2012-01-30 - 2012-02-01.
  • Nygaard, Olav Gerhard Hauken; Vefring, Erlend H; Fjelde, Kjell Kåre; Nævdal, Geir; Lorentzen, Rolf Johan; Mylvaganam, Saba (2004). Bottomhole pressure control during pipe connection in gas-dominant wells. 2004-10-11.
  • Nygaard, Olav Gerhard Hauken; Vefring, Erlend H; Mylvaganam, Saba; Lorentzen, Rolf Johan; Nævdal, Geir; Fjelde, Kjell Kåre (2004). Underbalanced drilling : improving pipe connection procedures using automatic control. 2004-09-26.
  • Vefring, Erlend H; Lorentzen, Rolf Johan; Nævdal, Geir; Fjelde, Kjell Kåre; Nygaard, Olav Gerhard Hauken (2003). Reservoir characterization during UBD : methodology and active tests. 2003-03-25 - 2003-03-26.
  • Vefring, Erlend H; Fjelde, Kjell Kåre; Lorentzen, Rolf Johan; Nygaard, Olav Gerhard Hauken; Nævdal, Geir; Merlo, Antonino (2002). Reservoir characterization during underbalanced drilling : methodology,accuracy, and necessary data. 2002-09-29 - 2002-10-02.